![]() |
|||||||||||||||||||||||||||||
Home | Tips | Commissioners | Water Quality Report | Rates & Charges | History | Maps & Directions | Requests | Sitemap |
|||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
|
Pay Your Bill Online With MASTERCARD DISCOVER AMERICAN EXPRESS VISA |
|||||||||||||||||||||||||||||
Current Events February 2012 Last update: Wednesday 2/1/2012
|
|||||||||||||||||||||||||||||
Studies and Updates on Water Rates and General Facilities Charges Since 2005 the District has authorized FCS Group of Seattle to do a series of comprehensive studies on rates and charges. Click on a link below to view a report. Click on a link below to view a report |
|||||||||||||||||||||||||||||
Information on Water Quality Disinfection by-product levels have not exceeded drinking water standards for the second and third quarters of 2011. Click on a link below to view a report. 2011 State of Washington Department of Health Notice of Compliance 2011 Public Notification of Violation 2010 Public Notification of Violation 2009 Public Notification of Violation 2008 Public Notification of Violation 2007 Public Notification of Violation Turbidity levels have not been exceeded since the completion of the Seymour-Capilano Filtration Project. Click on a link below to view a report. 2007 Notice of Drinking Water Turbidity Historical Water Quality Reports. For the current report see the Water Quality Report page. |
|||||||||||||||||||||||||||||
The District Report - First Quarter 2012
We have received notification from the Washington State Department of Health that we are now in compliance with the Disinfection By-Products Standard (DBP). The water system is no longer showing maximum contaminant levels (MCL) of total trihalomethanes (TTHM) or haloacetic acids (HAA) that exceed DBP rules. This is mainly due to the filtration plant at the Capilano Reservoir. With the new treatment it is now possible our running annual averages will fall even lower. We will continue to take regular samples and monitor the levels to ensure compliance, but as long as we are in compliance there will not have to be public notification of those levels. The Water Main Replacement Phase II bid has been awarded and work will commence within the month. Approximately 6000 lineal feet of water main will be replaced. The District completed approximately 5000 lineal feet of water main replacement under Phase I. |
|||||||||||||||||||||||||||||
| Send comments regarding the website to: webmaster@pointrobertswater.com | |||||||||||||||||||||||||||||
| Copyright © 2011 Point Roberts Water District. All rights reserved. | |||||||||||||||||||||||||||||